What is a good score on the GMAT? Also, what's the average score?
A score above 730 is the typical requirement for top business schools. It takes a 750 to get into Harvard Business. A score of 650 is considered very good and difficult to attain, at this point,...
more
A, B, C and D start a business with investments in a ratio 2:3:5:7. Rest of the problem in the question details?
A, B, C and D start a business with investments in a ratio 2:3:5:7. After 4 months A invest the same amount as before, B and C withdrew half their investment and D withrew 4/9th of it's investment....
more
Why is it important to have an Instructor who scores PERFECTLY
Many Tutors cite top 1% scores, without disclosing that this might mean they missed as many as 5-10 total questions on his/ her Exam. These are questions they can’t possibly explain to you...
more
10/29/22
I'm a teenager in high school working my first summer job. Do I have to complete Form W4?
Follow me for more fun taxation and accounting tips @gmacericpa.
Gmat
07/11/22
Puzzle relating to people living on different floors and likes different subjects solve
There are eight persons namely P, Q, R, S, T, U, V and W living in a building on a different floor. There are total eight floor in a building ground floor is numbered as one and so on, each of them...
more
Can anyone help me with this IQ test related math?
Please tell me how to find the missing number?
Gmat Data Sufficiency
03/16/22
Data Sufficiency (GMAT)
If wxyz ≠ 0, does wxyz = 1? Statement (1): w = 1/x, y = zStatement (2): wx² = 1/xyz CHOICES: A - Statement 1 ALONE is sufficient to answer the question, but statement 2 alone is NOT sufficient. B -...
more
Data Sufficiency Question (GMAT)
P and Q are positive integers. Is P odd?Statement #1: (P2)Q is oddStatement #2: P + Q is even Choices: A - Statement 1 ALONE is sufficient to answer the question, but statement 2 alone is NOT...
more
Complicated Work time math help.
A and B working together for 9 hours work in x days. B and C can get the job done in half the time A and B could in the same no of days. C and D working 8 hours takes 15 days longer than A and B to...
more
Work time math help
There are three groups, Group A has 6 efficient workers who can get a work done in 10 days. Group B has 8 moderately skilled workers who can get the same work done in 12 days. Group C has 10...
more
Vectors and the Geometry of Space
Suppose v.w=8 and ||v × w ||=2, and the angle between v and w is θ. Find(a) tanθ=(b) θ=
Consider the planes given by the equations
Consider the planes given by the equations −(x+2y+4z)=1, 4x+2y+z=7.(a) Find a vector v-> parallel to the line of intersection of the planes.v-> =...
more
Find a vectors perpendicular and parallel to the plane.
(a) Find a vector n-> perpendicular to the plane z=7x+8y. n-> =(b) Find a vector v-> parallel to the plane. v->=
Vectors and the Geometry of Space
Find an equation of the plane through the point (4, 0, 1) and parallel to the plane −1x−1y+3z=5.x + y + z =
Partial Derivatives
Find the point(s) on the surface z2=xy+1 which are closest to the point (7, 11, 0).List points as a comma-separated list, (e.g., (1,1,-1), (2, 0, -1), (2,0, 3))
Partial Derivatives
Design a rectangular milk carton box of width w, length l, and height h which holds 516 cm3 of milk. The sides of the box cost 3 cent/cm2 and the top and bottom cost 5 cent/cm22. Find the...
more
Still looking for help? Get the right answer, fast.
Ask a question for free
Get a free answer to a quick problem.
Most questions answered within 4 hours.
OR
Find an Online Tutor Now
Choose an expert and meet online. No packages or subscriptions, pay only for the time you need.