Cyrene N.

asked • 02/02/22

You know the time (T) it takes to build a bridge varies directly as the length (L) of the bridge and inversely to the number of workers (W) it takes 120 days to build a 20m bridge with 10 workers

A. Representation

1. Using symbols

2. Using equation


B. What is the constant of variation?


C. How long will it take to build the bridge if 2 workers will be out?


1. If the length of the bridge will be doubled to make it a two-way-wide bridge, how many weeks will 16 workers build the bridge?


2. Will the bridge be ready before the founding anniversary of the city competition to be held 4 months from now?


E. If the mayor of the city wants the 20m bridge to be finished by 2 months, how many workers will be needed? 

1 Expert Answer

By:

Raymond B. answered • 02/03/22

Tutor
5 (2)

Math, microeconomics or criminal justice

Still looking for help? Get the right answer, fast.

Ask a question for free

Get a free answer to a quick problem.
Most questions answered within 4 hours.

OR

Find an Online Tutor Now

Choose an expert and meet online. No packages or subscriptions, pay only for the time you need.