Let x = weight of the slab (in kg)
Then, 0.53x = weight (in kg) of cement portion
0.53x - 20.16 = weight (in kg) of the stone and sand
So, 0.53x + (0.53x - 20.16) = x
0.06x = 20.16
x = 336 kg