Phillip R. answered 09/09/14
Tutor
New to Wyzant
Top Notch Math and Science Tutoring from Brown Univ Grad
the first team completed 1/3 of the job working alone for 3 days. That leaves 2/3 of the job remaining.
Let x = days needed to complete the job
(1/9) x + (1/7)x = 2/3
7x + 9x = (2/3)(63)
16x = 42
x = 2.625 days
total days = 5.625