John 4 hours to do a job ... 1/4 job per hour
Kate 3 hours ... 1/3 job per hour
Nathan 2 hours ... 1/2 job per hour
Together they perform
1/4 + 1/3 + 1/2 = 3/12 + 4/12 + 6/12 = 13/12 job per hour.
This means the total job is complete in LESS than an hour.
(13/12 job/hour)(h hours) = 1 job
h = 12/13 of an hour to do the job together
(12/13 hours)(60 minutes/hour) = 55 5/13 minutes
(5/13 minutes)(60 seconds/minute) = 23.08 seconds
If you wish to take it that far then, all things being equal,
it takes the 3 of them a total of 55 minutes 23.08 seconds