Brittany K.
asked 09/05/23A construction company needs to remove tons of dirt from a construction site. They can remove tons of dirt each hour. How long will take to remove the dirt?
2 Answers By Expert Tutors
Without some values, this is the best answer. t=D/x.

Melissa H. answered 09/05/23
Engineer offering tutoring in all levels of math and science!
I think we are missing some information. If they can remove x tons of dirt per hour, and the total amount of dirt is D, then the time, t, it takes to remove all the dirt would be t = D/x.
Hope that helps.
Still looking for help? Get the right answer, fast.
Get a free answer to a quick problem.
Most questions answered within 4 hours.
OR
Choose an expert and meet online. No packages or subscriptions, pay only for the time you need.
Mark M.
Missing information. Review your post for accuracy.09/05/23