A building contractor is to dig a foundation

42

feet​ long,

12

feet​ wide, and

6

feet deep. The contractor pays

​$20

per load for trucks to remove the dirt. Each truck holds

8

cubic yards. What is the cost to the contractor to have all the dirt hauled​ away?A building contractor is to dig a foundation

42

feet​ long,

12

feet​ wide, and

6

feet deep. The contractor pays

​$20

per load for trucks to remove the dirt. Each truck holds

8

cubic yards. What is the cost to the contractor to have all the dirt hauled​ away?