A building contractor is to dig a foundation
42
feet long,
12
feet wide, and
6
feet deep. The contractor pays
$20
per load for trucks to remove the dirt. Each truck holds
8
cubic yards. What is the cost to the contractor to have all the dirt hauled away?A building contractor is to dig a foundation
42
feet long,
12
feet wide, and
6
feet deep. The contractor pays
$20
per load for trucks to remove the dirt. Each truck holds
8
cubic yards. What is the cost to the contractor to have all the dirt hauled away?