Mark M. answered 01/19/23
Mathematics Teacher - NCLB Highly Qualified
t represents the time needed for the apprentice
0.75t represents the time needed by Sumi
(2.267 / t) + (2.267 / 0.75t) = 1
Can you do the arithmetic and solvel for t and answer?
Sage D.
asked 01/19/23Sumi can wash the windows of an building 3/4 the time it takes her apprentice. One day they worked on a building together for 2 hours and 16 minutes, and then Sumi continued alone. It took 4 hours and 32 minutes to complete the job. How long would it take her apprentice to wash all the windows alone?
Mark M. answered 01/19/23
Mathematics Teacher - NCLB Highly Qualified
t represents the time needed for the apprentice
0.75t represents the time needed by Sumi
(2.267 / t) + (2.267 / 0.75t) = 1
Can you do the arithmetic and solvel for t and answer?
Get a free answer to a quick problem.
Most questions answered within 4 hours.
Choose an expert and meet online. No packages or subscriptions, pay only for the time you need.