Raymond B. answered 08/02/22
Tutor
5
(2)
Math, microeconomics or criminal justice
15 bt 20 =300 ft^2 costing 2275
which is 2275/300 per ft^2 = $7.58 1/3
25 by 28 would cost (25)(28)(2275/300) = 2275(7/3) = $5308.33