Osman A. answered 07/05/22
Professor of Engineering Mathematics – College Algebra, Algebra 2 & 1
James recently hired an electrician to do some necessary work. On the final bill, James was charged a total of $928. $445 was listed for parts and the rest for labor. If the hourly rate for labor was $46, how many hours of labor was needed to complete the job?
Detailed Solution:
Total Cost = $928 = Parts (Fixed Cost) + Labor (Variable Cost)
$928 = $445 + 46x
46x = 928 – 445
46x = 483
x = 483/46 = 10.5 Hours