Abby O.

asked • 08/05/21

Find the Work in Joules

A bucket that has a mass of 25 kg when filled with sand needs to be lifted to the top of a 15 meter tall building. You have a rope that has a mass of 0.3 kg/m that must be secured to the bucket. It takes 1 meter of rope to secure the bucket. Once the bucket reaches the top of the building it only has mass 20 kg because there was a hole in the bottom and sand was leaking out at a constant rate while it was being lifted to the top of the building.


Find the work in Joules done lifting the bucket (sand and rope) to the top of the building.

1 Expert Answer

By:

Still looking for help? Get the right answer, fast.

Ask a question for free

Get a free answer to a quick problem.
Most questions answered within 4 hours.

OR

Find an Online Tutor Now

Choose an expert and meet online. No packages or subscriptions, pay only for the time you need.