A construction company needs to remove 2 and 1/6 tons of dirt from a construction site. They can remove 7/8 tons of dirt each hour. What is the total number of hours it will take to remove the dirt?

1 Expert Answer

By:

MELINDA C. answered • 04/05/19

Tutor
5 (7)

MIT PhD engineering student specializing in math tutoring