Arthur D. answered 10/09/14
Tutor
4.9
(303)
Forty Year Educator: Classroom, Summer School, Substitute, Tutor
Eugene does 1/9 of the job in one hour
Molly does 1/7 of the job in one hour
x=# of hours working together to do the job
(1/9)x+(1/7)x=1 (job finished)
multiply both sides by 63
63(1/9)x+63(1/7)x=63(1)
7x+9x=63
16x=63
x=63/16
x=3.9375 hours or 3 15/16 hours working together
check: (1/9)(3.9375)=0.4375 of the job done by Eugene
(1/7)(3.9375)=0.5625 of the job done by Molly
0.4375+0.5625=1 (job finished)
Arthur D.
10/11/14