The cost of the project is the sum of the material (Door) cost and Labor. If we call D the cost of the door, and L the installation labor, we have:
D + L = $375 (1)
Also, we know that the labor was $75 less than the cost of the door. In other words, L = D - $75 (2)
Let's substitute (2) into (1): D + (D - $75) = $375
2D = $375 - $75 = $300 resulting D = $150
(a) Total = Door price + Labor or T = D + L where T is the total
(b) D= $140 L = $140 - $75 = $65 T = D + L = $205
(c) T = D + L
$375 = D + (D - $75)
$375 = 2D - $75
D = ($375 + $75)/2
(d) Solvind D from (c): D = $225 The cost of the Door should be $225 to get a total of $375
D =