
Lisa W. answered 11/13/15
Tutor
2.5
(2)
Patient and Competent Microbiology and Science Tutor
Dear The,
Let P equal production by the company
6A + 8B = P
then to incorporate the pricing:
6A (3000) + 8B (2000) = P
The problem says that A max = 2 so that means the company will have to make at least 2 tons per day to keep up with demand. So that means B is only 1 ton less, or 1.
So the company must make 2 tons of A and 1 ton of B to keep up with demand.
6*2* 3000 + 8*1* 2000 = P
3000 (12) + 2000 (8) = P
36,000 + 16,000 = 52,000 so P = 52,000 to keep up with demand.