A factory produces 2 types of paint, interior and exterior.
Raw materials for both the paint is A and B, each of which is available to a maximum of 6 tons and 8 tons per day.
Interior paint daily demand is higher than the exterior paint, but not more than 1 ton per day.
the maximum interior paint requests per day is 2 tons.
Interior paint prices = 3000
Exterior paint prices = 2000

How much does each paint to be in production by the factory to maximize the gross income?