
Alexander B. answered 09/11/15
Tutor
5
(7)
PhD in Engineering with 20 yrs of Math and Science Teaching Experience
Assume a surface area of the water lily is S, lake surface area L, the key equations is:
S(230)=L/2
multiplying by 2:
S(2x230)=L, or S(231)=L
thus it will take 31 days and 231 lilies to cover the entire lake.