
Yefim S. answered 03/18/21
Math Tutor with Experience
P(t) = P0ert; 100 = P0e15r and 1500 = P0e30r; 100/1500 = e-15r, r = - ln(1/15)/15 = 0.18053668
100 = P0e15 · 0.18053668; P0 = 100/e2.7080502 = 7
So, P(t) = 7e0.18052668t
Let P(T) = 14 to get double time T. 14 = 7e0.18053668T; T = ln2/0.18053668 = 3.84 min
P(110) = 7e0.18053668·110 = 2,949,628,152;
15000 = 7e0.18053668t; t = ln(15000/7)/0.18053668 = 42.484 minmin