Let's assume that they are unloading a truck with 300 boxes on it! (300 is arbitrary but makes math easy)
The first person unloads 300 boxes/30 min. second person unloads 300 boxes/30 min and the third person unloads 300 boxes/15 minutes or (all)... 10 boxes/min , 10 boxes/min, and 20 boxes/min
So, if they work together, they can unload (10+10+20)boxes/min = 40boxes/min
So, working together 300 boxes/40 boxes/min = 7.5 minutes.

Mark J.
05/14/19
Female P.
Thank you!05/14/19