Fdghfg R.

asked • 02/03/19

How long will it take to fill a cube-shaped vat with edge length 18.2 ft with a certain liquid (d=0.890 g/mL) if it is spilling out of the hose at 11046.9 g/s? (1.00 in = 2.54E0 cm)

How long will it take to fill a cube-shaped vat with edge length 18.2 ft with a certain liquid (d=0.890 g/mL) if it is spilling out of the hose at 11046.9 g/s?

(1.00 in = 2.54E0 cm)


4.76×10-9 hr

0.0617 hr

3.82 hr

1.06×106 hr

1.59×107 hr


1 Expert Answer

By:

Still looking for help? Get the right answer, fast.

Ask a question for free

Get a free answer to a quick problem.
Most questions answered within 4 hours.

OR

Find an Online Tutor Now

Choose an expert and meet online. No packages or subscriptions, pay only for the time you need.