Andy C. answered 09/23/17
Tutor
4.9
(27)
Math/Physics Tutor
70% chance the participant shows up.
90% chance the software works.
95% chance the data saves.
97% change of being error free.
The product is .7 * .9 * .95 * .97 = .580545 = 58.0545 % chance of a completely successful experiment.
-------------------------
Just out of blunt curiosity, I'm willing to bet that if the client shows up,
the probability is much higher. That is, ATTENDANCE is the problem.
Let's bump that probability up a lot say, 90%.
Now it is .9 * .9 * .95 * .97 = .76415 = 76.415%
That's over 18% increase (almost 2 letter grades)
Hence the reason for No Show Fees