Amy M. answered 03/19/15
Tutor
5.0
(1,583)
CalTech Grad, Software engineer with 30+ years experience.
R=(4800 pens)/(80mach•5hrs)
R=12 pens/(mach-hr)
12 pens are made by one machine in one hour.
P=(12 pens/(mach-hr))•
(25 mach)(7 hrs)
note the units of machine and hours cancel
P=2100 pens
2100 pens are made by 25 machines in 7 hours