Rate for mechanic 1 = a
Rate for mechanic 2 = b
Then
15a + 5b = 1825
and a + b = 155 Solving each simultaneously, we find that
a = $105
b = $50
Eva C.
asked 07/16/19Two mechanics worked on a car.
The first mechanic worked for 15 hours, and the second mechanic worked for 5 hours.
Together they charge a total of $1825.
What was the rate charged per hour by each mechanic if the sum of the two rates was $155 per hour?
Rate for mechanic 1 = a
Rate for mechanic 2 = b
Then
15a + 5b = 1825
and a + b = 155 Solving each simultaneously, we find that
a = $105
b = $50
Get a free answer to a quick problem.
Most questions answered within 4 hours.
Choose an expert and meet online. No packages or subscriptions, pay only for the time you need.