Arturo O. answered 09/08/18
Tutor
5.0
(66)
Experienced Physics Teacher for Physics Tutoring
Divide the total number of tons that must be removed by the number of tons that can be removed each hour. That will give the number of hours required.
(24 tons) / (3/4 tons/hour) = 24/(3/4) hours = ? hours