
Kenneth S. answered 05/18/17
Tutor
4.8
(62)
Expert Help in Algebra/Trig/(Pre)calculus to Guarantee Success in 2018
The question isn't phrased well.
Evidently you want to graph the situation where # of batches of envelopes depends on time (duration) of operating the machine.
x, the independent variable, should be time, and y, the dependent variable, is the 'output' (# of batches of stuffed envelopes).