Mark M. answered 10/11/15
Tutor
5.0
(278)
Mathematics Teacher - NCLB Highly Qualified
This is a direct variation - as the area increase so does the time needed to paint.
45 / 144 = t / 240 multiply both sides by 240 ft2
240(45) / 144 = t multiply
10800 / 144 = t
240 = t
75 = t
The job would take 75 minutes.
Rini C.
10/11/15