A crane at a construction site slowly lowers a concrete pillar hanging from a vertical steel cable. The pillar descends with constant velocity. For each of these following statements, mark if they are true or false.


T F a) The work done on the pillar by the gravity is negative.

T F b) The magnitude of the work done by the tension of the cable is less than the the magnitude of the work done by gravity.

T F c) The net work done on the pillar is zero

T F d) The work done on the pillar by tension is zero.