
Brian L. answered 10/24/23
Board Certified Oncology Pharmacist and Pharmacotherapy Specialist
Work is Force x Distance.
The amount of work done lifting a 100 N crate a distance of 1.5 m is 150 J. I would say that the answer is 2 (150 J), since we are lifting the crate straight up and not dealing with friction.