Shrabana G. answered 04/23/20
Math tutor with Software Engg background
Let David take x min
So steven will take (x-5) min
Rate of Davids work =1/x per min
Rate of steven work = 1/(x-5) per min
combined work
1/x +1/(x-5) = 1/6
6(2x-5) = x(x-5)
12x -30 = x2 -5x
x2 -17x +30 = 0
(x-15)(x-2) =0
x =15 or 2
David will take 15 min
x = 2 is not a valid value as Steven take 5 mins less time than Davis and 2-5 is negative.
x=15 or 2