The wall takes 4men 6 hours.
a. How long will it take 10 men?
The way to set up this equation is as follows:
4 men take 6 hours. 10 men take X hours.
To build the same well,
4 * 6 hours = 10 * X hours
24 = 10X
X = 2.4hours.
It would take 10 men 2.4 hours.
b. How many men would need to build it in 12 hours?
We set the equations the same way.
6 hours for 4 men and 12 hours for X men.
6 * 4 = 12 * X
24 = 12X
24/12 = X
X = 2 men.
It will take 2 men 12 hours.