On an energy basis, Work = Change in Kinetic Energy + Change in Potential Energy
Work is work from non-conservative forces, the 4 N down the ramp and the friction force up the ramp. Then do force *distance 4*8 - (.25)(10)(9.8)(.559) x 8
mgh2-mgh1 = 0 - 10*9.8*6.632 (Where 0 energy is defined at bottom of the ramp) 6.632 is height of ramp.
for kinetic energy, (.5)(10)(v2)^2 - (.5)(10)(5)^2 v2 = final velocity & 5 = initial velocity (given)
Collecting terms & solviing for v2, we find that the final velocity = 11.8 m/s