Isaac C. answered 05/23/17
Tutor
4.9
(823)
Physics, Chemistry, Math, and Computer Programming Tutor
Assuming that the weight was done against gravity, the work done on the board is 800 N * 0.06 m = 48 J.
Since the screw is not 100% efficient, extra work must be done using the screw. Wout/Win = 0.18
Win = Wout/0.18
48J / 0.18 = 267 J.