Norbert W. answered 07/25/16
Tutor
4.4
(5)
Math and Computer Language Tutor
To build 8 cabinets it took (9 men) (12 days) = 108 man-days
To build 1 cabinet it takes 27/2 man- days
The rate for building a cabinet is 2/27 cabinet/man-days.
6 men working for 4 days is 24 man-days
They can build (2/27 cabinet/man-days) (24 man-days) = 16/9 ≈ 1.8 cabinets.
Mark M.
07/25/16