Raymond B. answered 10/01/20
Math, microeconomics or criminal justice
1/9 + 1/7 = 1/x
multiply by 63x
7x + 9x = 63
16x = 63
x = 63/16 = about 3.9 hours
They're averaging about 8 hours each
together should do half that or abour 4 hours
Alyssa Z.
asked 09/27/20A company found that an experienced surveyor can survey a roadbed in 7 hours. An apprentice surveyor needs
9 hours to survey the same stretch of road. If the two work together, find how long it takes them to complete the job.
Raymond B. answered 10/01/20
Math, microeconomics or criminal justice
1/9 + 1/7 = 1/x
multiply by 63x
7x + 9x = 63
16x = 63
x = 63/16 = about 3.9 hours
They're averaging about 8 hours each
together should do half that or abour 4 hours
Get a free answer to a quick problem.
Most questions answered within 4 hours.
Choose an expert and meet online. No packages or subscriptions, pay only for the time you need.