Abhishek D.

asked • 02/16/14

A can do a work in 6 days while b can do a work in 8 days. They worked together for 2 days and B left the work. How time will A require to complete the work?

Help me with this question if unitary method. 
 
 
A can do a work in 6 days while b can do a work in 8 days. They worked together for 2 days and B left the work. How time will A require to complete the work?

2 Answers By Expert Tutors

By:

Charles G. answered • 02/16/14

Tutor
4.7 (147)

Tutoring to Empower You!

Parviz F. answered • 02/16/14

Tutor
4.8 (4)

Mathematics professor at Community Colleges

Charles G.

You have overlooked something in creating your formula. 
 
Consider that A does 1/6 of the job everyday they work.  B does 1/8 of the job everyday they work.  So everyday they would work together would do 14/48 ([1/6]+[1/8]) of the job or 7/24 job.
 
 
So in two days; A would do 2 x 7/24 of the job or 7/12. Thus leaving 5/12 of the job for A to do alone at a rate of 2/12 of the job per day. Thus it would take A 2.5 days to complete the remaining job alone.
Report

02/16/14

Still looking for help? Get the right answer, fast.

Ask a question for free

Get a free answer to a quick problem.
Most questions answered within 4 hours.

OR

Find an Online Tutor Now

Choose an expert and meet online. No packages or subscriptions, pay only for the time you need.