
Andrew M. answered 08/24/15
Tutor
New to Wyzant
Mathematics - Algebra a Specialty / F.I.T. Grad - B.S. w/Honors
We need to set up an equation that shows how much of the job
the two complete together per minute... Then figure out how many
minutes to multiply that by to complete 100% of the job
Vern does 1/45 of the job per minute
Nina does 1/60 of the job per minute
(1/45 + 1/60)x = 100%
(1/45 + 1/60)x = 1
(4/180 + 3/180)x = 1
(7/180)x = 1
x = 180/7
x = 25 5/7 minutes to do the job together