Tessalynn T.
asked 01/30/24A 10 ft chain weighs 55 lb and hangs from a ceiling. Find the work done (in ft-lb) in lifting the lower end of the chain to the ceiling so that it's level with the upper end.
A 10 ft chain weighs 55 lb and hangs from a ceiling. Find the work done (in ft-lb) in lifting the lower end of the chain to the ceiling so that it's level with the upper end.
More
1 Expert Answer
Yefim S. answered 01/31/24
Tutor
5
(20)
Math Tutor with Experience
Work W = ∫0lP/l(l - y)dy = - P/l(l - y)2/20l = Pl2/(2l) = Pl/2 = 55lb·10ft/2 = 275 ft-lb
Still looking for help? Get the right answer, fast.
Ask a question for free
Get a free answer to a quick problem.
Most questions answered within 4 hours.
OR
Find an Online Tutor Now
Choose an expert and meet online. No packages or subscriptions, pay only for the time you need.
Paul M.
01/30/24