asked 11/14/23Optimization quiestion
A power line is to be run to an offshore facility as shown in the figure above. The offshore facility is D=4 AND L=4 miles at sea and miles along the shoreline from the power plant. It costs $ 50,000 per mile to lay a power line underground and $ 85,000 per mile to run the line underwater.
How much of the power line should be run underground, and how much underwater to minimize the overall costs?
Length underground (in miles):
Length underwater (in miles):
Minimal cost (in dollars):
1 Expert Answer
Mark M. answered 11/15/23
Retired math prof. Calc 1, 2 and AP Calculus tutoring experience.
shoreline
___x_____4-x________Power Plant
l ⁄
4 l ⁄
l ⁄
l ⁄
Facility
C(x) = cost = 50000(4 - x) + 85000√(x2+ 16), where x is in the interval [0,4].
C'(x) = -50000 + 85000x/ √(x2+16) = [-50000√(x2+16) + 85000x] / √(x2+16) = 0
√(x2 + 16) = 1.7x
x2 + 16 = 2.89x2
x = 2.9
Minimum cost is the smaller of C(0), C(2.9), or C(4)
C(0) = $540,000
C(4) = $480,832.61
C(2.9) = $474,955.06
Minimum cost is $474,955.06 when x = 2.9 (run the line 1.1 miles underground and √[(2.9)2+4] miles under water
Still looking for help? Get the right answer, fast.
Get a free answer to a quick problem.
Most questions answered within 4 hours.
OR
Choose an expert and meet online. No packages or subscriptions, pay only for the time you need.
Mark M.
Did you draw and label a diagram?11/15/23