
Lisa D. answered 03/24/15
Tutor
4.7
(3)
Accounting Tutor
It takes 900 hours to produce 500 units, so that is 1.8 hours per unit (900 / 500). Therefore, if they produced 400 units in May, it would be 1.8 standard hours x 400 units = 720.
Sagnik B.
03/25/15