Ari B.

asked • 02/08/22

For one week management determined the number of units produced at the end of t hours during an eight-hour shift. The average values of x for the week are shown in the table.

The cost of producing x units of a product is C = 60x + 1350. For one week management determined the number of units produced at the end of t hours during an eight-hour shift. The average values of x for the week are shown in the table.

t 0 1 2 3 4 5 6 7 8
x 0 16 56 130 200 269 339 386 391


(a) Use a graphing utility to fit a cubic model to the data. (Round your coefficients to three decimal places.)

x(t)=?


(b) Use the Chain Rule to find dC/dt. (Round your coefficients to three decimal places.)

dC/dT=?



Mark M.

Which graphing utility did you use? Do you know the chain rule?
Report

02/08/22

1 Expert Answer

By:

Bradford T. answered • 02/08/22

Tutor
4.9 (29)

Retired Engineer / Upper level math instructor

Still looking for help? Get the right answer, fast.

Ask a question for free

Get a free answer to a quick problem.
Most questions answered within 4 hours.

OR

Find an Online Tutor Now

Choose an expert and meet online. No packages or subscriptions, pay only for the time you need.