Mo O.

asked • 01/04/22

Question in description

At the start of the workday, 40,000 cubic feet of dirt was piled up at a construction site. Dirt will be added to the pile for the next 8 hours, satisfying the increasing differential equation dP over dt equals 1 over 8 times the quantity P minus 6000 comma where the function P represents the total amount of dirt in the pile. P is measured in cubic feet, and t is measured in hours from the start of the workday.

Part A: Estimate the amount of dirt in the pile after 4 hours, using the tangent line to the graph of P at t = 0. (10 points)

Part B: Find and use d squared P over dt squared to determine if what you found in Part A was an underestimate or an overestimate at t = 4. (10 points)

Part C: Find the general solution to the differential equation dP over dt equals 1 over 8 times the quantity P minus 6000 period (10 points)


1 Expert Answer

By:

Yefim S. answered • 01/04/22

Tutor
5 (20)

Math Tutor with Experience

Still looking for help? Get the right answer, fast.

Ask a question for free

Get a free answer to a quick problem.
Most questions answered within 4 hours.

OR

Find an Online Tutor Now

Choose an expert and meet online. No packages or subscriptions, pay only for the time you need.