To determine the number of units produced during the 6 hours between the beginning of the challenge and the end of the day, we can integrate the rate at which the units are being produced:
∫06(0.1t3 - 1.1t2 + 2.4t + 3.6)dt = [(1/4)0.1t4 - (1/3)1.1t3 + (1/2)2.4t2 + 3.6t]06
= (1/4)0.1(6)4 - (1/3)1.1(6)3 + (1/2)(2.4)(6)2 + 3.6(6)
= (1/4)(0.1)(6)4 - (1/3)(1.1)(6)3 + (1/2)(0.4)(6)3 + 0.1(63)
= 63((0.1)6/4 - (1/3)(1.1) + (1/2)(0.4) + 0.1)
= 63(0.15 - (1/3)(1.1) + 0.2 + 0.1)
= 63(0.45 - 1.1/3)
= 63(1.35 - 1.1)/3
= 2(62(0.25)
= 2(32)
= 18
(no need to follow these exact steps, as long as you can simplify your answer and wind up with 18).
18 was the exact amount needed in this period to obtain the bonus (there had to be 20 total and 2 were already produced).
Therefore, they should get their bonus