Draw a figure!
Let L = length of kite string and s = distance from the tether to a point directly under the kite.
L2 = 104 + s2
L(dL/dt) = s(ds/dt) => dL/dt = (s/L)(ds/dt)
θ=arc sin(100/L)
dθ/dt = (-100/sqrt(L2-104)(dL/dt)
Now you have a relationship between the rate of change of θ and the rate of change of s which is what you need to solve the problem. Good luck!