Malaysia M.

asked • 09/26/18

At a salt mine one conveyer belt requires 20 minutes to fill a large truck with ore and the second requires 30 minutes

How long would it take both conveyor belts working together to fill the truck with ore

1 Expert Answer

By:

Still looking for help? Get the right answer, fast.

Ask a question for free

Get a free answer to a quick problem.
Most questions answered within 4 hours.

OR

Find an Online Tutor Now

Choose an expert and meet online. No packages or subscriptions, pay only for the time you need.