1. Figure out the rate of cans/minute for each machine
newer machine = 5100/170 = 30 cans/minute
older machine = 5100/255 = 20 cans/minute
2. Add the rates together to determine their combined rate of cans/minute
older machine = 5100/255 = 20 cans/minute
2. Add the rates together to determine their combined rate of cans/minute
together 20 + 30 = 50 cans per minute
3. Divide that rate by the total number of cans
5100/50 = 102 minutes to produce 5100 cans
5100/50 = 102 minutes to produce 5100 cans