56 blocks are shared by 4 trucks
So each truck gets a share of 56 /4 = 14 blocks
One block takes 12 and 1 over 2 = 25/2 min = 12.5 min
so 14 blocks will take 12.5 x 14 = 175 min
so in 175 min all blocks get cleared of garbage
Assuming all trucks are working together at the same time

Andrew M.
02/17/17