Ong L.

asked • 12/12/15

Calculus- What is the work required?

A cable that weight 1.5kg/meter and is attached to a bucket that weight 75kg. Initially there are 500kg of grain in the bucket and as the bucket is raised 2kg of grain leaks out of the hole in the bucket for every meter the bucket is raised. The bucket is 200meters below a bridge. How much work is required to raise the bucket to the top of the bridge?

1 Expert Answer

By:

Still looking for help? Get the right answer, fast.

Ask a question for free

Get a free answer to a quick problem.
Most questions answered within 4 hours.

OR

Find an Online Tutor Now

Choose an expert and meet online. No packages or subscriptions, pay only for the time you need.