Karim I. answered 08/24/24
PhD & PE Helping You Pass the FE Civil Exam with Confidence
The daily production rate is the output that can be produced by the excavator during the standard 8-hour workday, measured in yd3/day. The key is to find the number of cycles that can be performed per day, and multiply that by the capacity of each cycle. The daily production rate can be calculated as follows:
4 yd3 x number of cycles per day = 4yd3 x (8 hours x 60 minutes x 60 seconds)/45 seconds = 2,560 yd3/day.