Raymond B. answered 01/31/22
Math, microeconomics or criminal justice
vertices of the feasible region are (0,0), (0,100), ( 400, 500) and (1400, 0)
max profit is at (400,500)
max profit = 14(400) + 22(500) -900= 15,700 when x=400 and y = 500
Butter C.
asked 01/31/22A factory can produce two products, x and y, with a profit approximated by P=14x+22y−900. The production of y must exceed the production of x by at least 100 units. Moreover, production levels are limited by the formula x+2y≤1400.
Raymond B. answered 01/31/22
Math, microeconomics or criminal justice
vertices of the feasible region are (0,0), (0,100), ( 400, 500) and (1400, 0)
max profit is at (400,500)
max profit = 14(400) + 22(500) -900= 15,700 when x=400 and y = 500
Get a free answer to a quick problem.
Most questions answered within 4 hours.
Choose an expert and meet online. No packages or subscriptions, pay only for the time you need.