What is the average variable cost at 24 units of output?

Assume that one laborer produces 6 units of output, two laborers produce 14 units, three produce 20 units, and four produce 24 units. If the cost is $12 per laborer and fixed costs are $100.
 

a) $100.

b) $37.

c) $2.

d) $6.17.

e) $24.