Mark M. answered 03/03/15
Tutor
5.0
(278)
Mathematics Teacher - NCLB Highly Qualified
x = hours needed by the designer
x + 16 = hours needed by the assistant
In 6 hours the designer does 6/x of the job.
In 6 hours the assistant does 6/(x + 16) of the job.
Together they complete the 1 job:
6/x + 6/(x + 16) = 1
6(x + 16) + 6x = x2 + 16x
6x + 96 + 6x = x2 + 16x
12x + 96 = x2 + 16x
0 = x2 + 4x - 96
0 = (x + 12)(x - 8)
{-12, 8}
The designer needs 8 hours and the assistant needs 24 hours.